top of page
Building 2530 Project Photos

These photos are from Phase 2 - Building 2530 of the community wide reconstruction project. 

2530 A deck repairs joists, shear, studs
2530 A deck demo 311.png
2530 A deck repair joists 314.png
2530 A deck demo shoring.png
2530 A deck demo sill, joist damage.png
2530 A 100% wall repair demo Right side.
2530 A 100% wall repair Left side.png
2530 100% wall repair 31521.png
2530 A 100% wall repair A-35 at sill pla
2530 A deck repair 314.png
2530 A 100% wall repair brown coat 2 32
2530 dry rot at joist ends.jpeg
2530 A 100% wall repair lathe 2.jpeg
2530 A 100% wall repair A-34. 315.png
2530 A deck demo shoring 2.jpeg
IMG_0535.jpeg
IMG_0533.jpeg
bottom of page